Holiday Schedule Contact Us 562.432.5451
USA Flag
Products Agencies AFCO Our Team Resources Favorites
Long Beach Iron Works Critical Infrastructure Manufacturing
East Jordan Iron Works AFCO Logo

Resources

  • Agency Standard Plan Drawings
  • Agency Website Links
  • Definition Of Common Terms
  • Foundry Cross References
  • LBIW Catalog (1973)
  • Rebar Conversion Chart
  • Trench Forming Suggestions
  • Useful Mathematical References
SS-16 - WATER VALVE COVER DETAIL SS-16 - WATER VALVE COVER DETAIL SS-26 - COMBINATION INLET CATCH BASIN SS-26 - COMBINATION INLET CATCH BASIN SS-26A - CURB INLET CATCH BASIN SS-26A - CURB INLET CATCH BASIN SS-35A - STORM WATER CATCH BASIN SS-35A - STORM WATER CATCH BASIN SS-36 - GRAVITY TYPE HEADWALL SS-36 - GRAVITY TYPE HEADWALL SS-38 - STANDARD DRYWELL DETAIL SS-38 - STANDARD DRYWELL DETAIL SS-8 - STANDARD SURVEY MONUMENT SS-8 - STANDARD SURVEY MONUMENT SS-9 - SEWER MANHOLE DETAIL SS-9 - SEWER MANHOLE DETAIL
2020 West 14th Street
Long Beach, CA 90813
562.432.5451
  • East Jordan Iron Works
  • Contact Us
  • Certifications, Qualifications and Approvals
  • Limitations and Legal Notice

Hablamos Español | ©2022 Copyright LBIW. All rights reserved.

LBIW 112 Years Logo

2025 Holiday Schedule

New Year’s DayMonday, January 1
EasterFriday, March 29
Memorial DayMonday, May 27
Independence DayThursday–Friday, July 4–5
Labor DayMonday, September 2
ThanksgivingThursday–Friday, November 28–29
ChristmasMonday–Wednesday, December 23–25

Phone 562.432.5451 | FAX 562.435.5929 | lbiw.com
2020 West 14th Street Long Beach, CA 90813 | Shipping & Receiving: 7:00 am – 3:30 pm (M – F)