Holiday Schedule Contact Us 562.432.5451
USA Flag
Products Agencies AFCO Our Team Resources Favorites
Long Beach Iron Works Critical Infrastructure Manufacturing
East Jordan Iron Works AFCO Logo

Resources

  • Agency Standard Plan Drawings
  • Agency Website Links
  • Definition Of Common Terms
  • Foundry Cross References
  • LBIW Catalog (1973)
  • Rebar Conversion Chart
  • Trench Forming Suggestions
  • Useful Mathematical References
200-2 - PRECAST CONCRET SEWER MANHOLE 200-2 - PRECAST CONCRET SEWER MANHOLE 201-1 - PRECAST CONCRETE SHALLOW MANHOLE 201-1 - PRECAST CONCRETE SHALLOW MANHOLE 203-1 - BRICK SEWER MANHOLE 203-1 - BRICK SEWER MANHOLE 210-2 - 24 INCH MANHOLE FRAME AND COVER LOCKING TYPE 210-2 - 24 INCH MANHOLE FRAME AND COVER LOCKING TYPE 211-1 - MH FRAME AND COVER PRESSURE TYPE 211-1 - MH FRAME AND COVER PRESSURE TYPE 212-1 - ANCHOR SYSTEM FOR PRESSURE COVER 212-1 - ANCHOR SYSTEM FOR PRESSURE COVER 300-2 - CURB OPENING CATCH BASIN 300-2 - CURB OPENING CATCH BASIN 304-2 - GRATING CATCH BASIN - ALLEY - LONGITUDINAL 304-2 - GRATING CATCH BASIN - ALLEY - LONGITUDINAL 305-2 - GRATING CATCH BASIN - ALLEY - TRANSVERSE 305-2 - GRATING CATCH BASIN - ALLEY - TRANSVERSE 307-2 - CURB OPENING CATCH BASIN W MANHOLE IN STREET 307-2 - CURB OPENING CATCH BASIN W MANHOLE IN STREET 310-2 -  CATCH BASIN CURB PLATE ASSY DETAILS 310-2 - CATCH BASIN CURB PLATE ASSY DETAILS 311-2 - FRAME AND GRATING FOR CBS 311-2 - FRAME AND GRATING FOR CBS 630-2 - 24 INCH MANHOLE FRAME AND COVER 630-2 - 24 INCH MANHOLE FRAME AND COVER 632-2 - 30 INCH MANHOLE FRAME AND COVER 632-2 - 30 INCH MANHOLE FRAME AND COVER 633-2 - 36 INCH MANHOLE FRAME AND COVER 633-2 - 36 INCH MANHOLE FRAME AND COVER 635-2 - STEEL STEP 635-2 - STEEL STEP 636-1 - POLYPROPYLENE PLASTIC STEP 636-1 - POLYPROPYLENE PLASTIC STEP Anaheim Std 395 Down Drain Anaheim Std 395 Down Drain Down Drain 331 Down Drain 331 GENERAL FACILITIES INDEX GENERAL FACILITIES INDEX SEWER INDEX SHEET SEWER INDEX SHEET STORM DRAIN INDEX SHEET STORM DRAIN INDEX SHEET
2020 West 14th Street
Long Beach, CA 90813
562.432.5451
  • East Jordan Iron Works
  • Contact Us
  • Certifications, Qualifications and Approvals
  • Limitations and Legal Notice

Hablamos Español | ©2022 Copyright LBIW. All rights reserved.

LBIW 112 Years Logo

2025 Holiday Schedule

New Year’s DayMonday, January 1
EasterFriday, March 29
Memorial DayMonday, May 27
Independence DayThursday–Friday, July 4–5
Labor DayMonday, September 2
ThanksgivingThursday–Friday, November 28–29
ChristmasMonday–Wednesday, December 23–25

Phone 562.432.5451 | FAX 562.435.5929 | lbiw.com
2020 West 14th Street Long Beach, CA 90813 | Shipping & Receiving: 7:00 am – 3:30 pm (M – F)