Holiday Schedule Contact Us 562.432.5451
USA Flag
Products Agencies AFCO Our Team Resources Favorites
Long Beach Iron Works Critical Infrastructure Manufacturing
East Jordan Iron Works AFCO Logo

Resources

  • Agency Standard Plan Drawings
  • Agency Website Links
  • Definition Of Common Terms
  • Foundry Cross References
  • LBIW Catalog (1973)
  • Rebar Conversion Chart
  • Trench Forming Suggestions
  • Useful Mathematical References
131 - TREE GRATES 131 - TREE GRATES 201 - SEWER MANHOLE BASE 201 - SEWER MANHOLE BASE 208 - SEWER CLEAN-OUT 208 - SEWER CLEAN-OUT 301 - INLET TYPE I - OS 301 - INLET TYPE I - OS 302 - INLET TYPE II - OL 302 - INLET TYPE II - OL 303 - INLET TYPE III - GOL 303 - INLET TYPE III - GOL 304 - INLET TYPE IV - GVOV 304 - INLET TYPE IV - GVOV 305 - MISC CURB INLET DETAILS AND NOTES 305 - MISC CURB INLET DETAILS AND NOTES 306 - MISCELLANEOUS INLET - DETAILS AND NOTES 306 - MISCELLANEOUS INLET - DETAILS AND NOTES 309 - PARKWAY CULVERT TYPE 'A' 309 - PARKWAY CULVERT TYPE 'A' 310 - PARKWAY CULVERT TYPE 'B' 310 - PARKWAY CULVERT TYPE 'B' 311 - PARKWAY CULVERT TYPE 'C' 311 - PARKWAY CULVERT TYPE 'C' 312 - PARKWAY CULVERT DETAILS AND NOTES 312 - PARKWAY CULVERT DETAILS AND NOTES 313 - JUNCTION STRUCTURE TYPE I - OUTLET DIAMETER 39 INCHES OR LESS 313 - JUNCTION STRUCTURE TYPE I - OUTLET DIAMETER 39 INCHES OR LESS 314 - JUNCTION STRUCTURE TYPE II - OUTLET DIA 42 INCH OR GREATER 314 - JUNCTION STRUCTURE TYPE II - OUTLET DIA 42 INCH OR GREATER 315 - JUNCTION STRUCTURE TYPE III 315 - JUNCTION STRUCTURE TYPE III 318 - CONSTRUCTION DETAILS CAST-IN-PLACE CONCRETE PIPE 318 - CONSTRUCTION DETAILS CAST-IN-PLACE CONCRETE PIPE 319 - JUNCTION STRUCTURE CAST-IN-PLACE CONCRETE PIPE 319 - JUNCTION STRUCTURE CAST-IN-PLACE CONCRETE PIPE 331 - DOWNDRAIN TO PIPE TRANSITION 331 - DOWNDRAIN TO PIPE TRANSITION 337 - DESILTING BASIN 337 - DESILTING BASIN 407 - STANDARD MANHOLE FRAMES AND COVERS 407 - STANDARD MANHOLE FRAMES AND COVERS 408 - PRECAST REINFORCED CONCRETE MANHOLE 408 - PRECAST REINFORCED CONCRETE MANHOLE
2020 West 14th Street
Long Beach, CA 90813
562.432.5451
  • East Jordan Iron Works
  • Contact Us
  • Certifications, Qualifications and Approvals
  • Limitations and Legal Notice

Hablamos Español | ©2022 Copyright LBIW. All rights reserved.

LBIW 112 Years Logo

2025 Holiday Schedule

New Year’s DayMonday, January 1
EasterFriday, March 29
Memorial DayMonday, May 27
Independence DayThursday–Friday, July 4–5
Labor DayMonday, September 2
ThanksgivingThursday–Friday, November 28–29
ChristmasMonday–Wednesday, December 23–25

Phone 562.432.5451 | FAX 562.435.5929 | lbiw.com
2020 West 14th Street Long Beach, CA 90813 | Shipping & Receiving: 7:00 am – 3:30 pm (M – F)